Balaji Industrial and Agricultural Castings  
Quality that find
line
line
line
line
line
line
 

Water Supply Projects

With Liberalization and Globalization being experienced and having great opportunities for the INFRASTRUCTURE PROJECTS in India and abroad.We at BALAJI are poised to enrich the nation with the best of Infrastructure facilities and top Quality workmanship.

Government of India has emphasized on the Infrastructure needs of the Country as the back bone to the nation. With the increasing thrust area being the INFRASTRUCTURE, where OUR VALUE SYSTEMS are based over a period of THREE DECADES in providing the Nation with best of the Technology be it be WATER or ROADS or CYCLONE RELIEF PROJECTS under WORLD BANK AIDED PROJECTS.

Balaji Industrial and Agricultural Castings is a leading ISO 9002 certified reputed organization. We are undertaking Water supply, Water treatment plants, Pump house, Civil Structures in the river bed, jackwells in river beds construction of passages for creeks of back waters of sea, GLBR's, OHSR's Delivery chambers, Deflouridation plants, and all types of Water management facilities. We have undertaken Pumping mains, Distribution mains of various types of pipes such as C.I. Pipes, A.C. Pipes, R.C.C. Pipes, PVC Pipes, HDPE Pipes and M.S. Pipes sizes ranging from of 63mm to 400mm Dia during execution of different projects.

We have carried out works of different kinds in Pumping systems, Cyclone relief projects, Construction of jack wells in river beds, Rural water supply schemes, Irrigation schemes, Deflouridation schemes, Iron removal plants, Supplying and fixing of Hand pumps under UNICEF and DENADA Projects. The above works are done under various Government departments of different States in India.

In this back drop, we at BALAJI strive to be on the TOP of every opportunity to strengthen the INFRASTRUCTURE PROJECTS of the Country.

We have specialized and experienced in various projects of prominence in the following fields.

Spectrum of Projects
  • ROADS AND BRIDGES
  • FLYOVERS AND MINOR BRIDGES
  • TURNKEY WATER SUPPLY PROJECTS
  • WATER TREATMENT PLANTS
  • EFFLUENT TREATMENT PLANTS
  • LIFT IRRIGATION PROJECTS
  • ELECTRICAL TRANSFORMERS
  • POWER OVER HEAD LINES
  • ELECTRICAL POWER DISTRIBUTION SYSTEMS
  • CONTROL POWER SWITCH GEAR SYSTEMS
  • TRANSFORMER YARDS
  • ELECTRICAL POWER STATIONS
ROADS AND BRIDGES ENGG:

Evaluating the necessary project need, understanding and usage of Technology to achieve the targeted GOAL is the main CORE COMPETENCY at BALAJI.

We at BALAJI have garnered rich experience in the field of SURVEYING, Detailed Field Investigation, collection of DATA with necessary usage of Information Technology using data modeling, (Analysis of critical data for effectively DESIGNING the Technology for Laying of ROADS or Bridges to the Perfection with the help of AUTOMATED MACHINERY).

WATER RESOURCE MANAGEMENT:

One of the Pioneering Technologies of yester years was DEFLOURIDATION PLANTS for the FLOURIDE EFFECTED WATER in NALGONDA DISTRICT of Andhra Pradesh, INDIA.

The Challenge was accepted by us and the REFINED DEFLOURIDATION PLANT had been DESIGNED FOR THE SMALL COMMUNITIES of the NALGONDA District with great SUCCESS.

Another Project was to Provide Drinking Water Supply to EARTH QUAKE EFFECTED AREAS of MAHARASHTRA which was taken up on WAR FOOTING and completed to the satisfaction of the Department as well as to the satisfaction of World Bank Officials.

These are only some Mile stones crossed in our endeavour to provide CLEAN and POTABLE WATER to the Millions of people across India.

We have also taken up COMMUNITY Drinking water supply schemes in Nigeria with WATER WELL DRILLING up to a depth of 1200ft and providing most important LIFELINE (WATER) to the rural community.

With regards to COMMUNITY WATER SUPPLY SCHEMES the nature of work undertaken is: Digging of open well,or borehole,construction of Pump House, Construction of Over Head Water Service Reservoir, Laying of pipe lines for distribution of Water. We have ample experience in laying pipe lines under water near sea shores and also in river beds like PVC Pipes, HDPE Pipes, AC Pipes, and MS Pipes.

We have expertise in laying of pipelines 60 feet below the ground level, in sand and River Beds. Construction of Treatment Plants, Filter Beds and SS Tanks.

The challenges were innumerable and the examples cited are hand picked few. One of the most important Challenge was IRON REMOVAL from the WATER which was in excess of the LIMITS.

We have designed a SMALL and efficient system to ALIGN WITH THE HAND PUMP to remove IRON CONTENT from the WATER THRU AERATION Technology without the use of POWER or ELECTRICIY.

So far we have completed the following water supply projects well with in stipulated time and budget to the entire satisfaction of the respective Departments.

  1. DEFLOURIDATION PROJECT IN NANDIGAMA AND NALGONDA (A.P)

  2. CYCLONE REHABILITATION PROGRAM FOR SAFE DRINKING WATER IN ONGOLE AND NELLORE IN ANDHRA PRADESH UNDER WORLD BANK PROJECT.

  3. DESIGN AND EXECUTION OF RURAL WATER SUPPLY SCHEME IN BEED DISTRICT OF MAHARASHTRA UNDER WORLD BANK PROJECT PHASE I & II.

  4. SUBMISSION PROJECT UNDER RAJEEV GANDHI TECHNOLOGY MISSION FOR RURAL WATER SUPPLY IN CHITTOOR DISTRICT OF A.P.
 
 

 


Send mail
 
dthrotarydrilling.com 
Home | About us | Subscribe | Advertise in Magazine | Board | Technical Papers | Interview | E-Paper | Editor's Desk | Media Kit | Directory | Contact Us | Site Map
Terms & Conditions - Disclaimer Copyright © 2009 dthrotarydrilling.com All rights reserved.