Balaji Industrial and Agricultural Castings  
Quality that find
line
line
line
line
line
line
 

Pipeline Network

DESIGN AND EXECUTION OF RURAL WATER SUPPLY SCHEME IN BEED DISTRICT OF MAHARASHTRA UNDER WORLD BANK AIDED PROJECTS.

The total project outlay was to the tune of Rs.100 million which was planed in 2 phases.  The scope of work is as under.

Construction of jack well in Godavari river, which was a tough task, considering the river flow the work has been planned in such a way that every aspect of the project was considered important and completed with top quality skills and material.

Construction of open well, laying of pumping main, construction of OHSR's and laying of different pipes ranging from63 mm to 250 mm Dia for distribution of water to various villages.

The project was started during mid 1994 and completed in 1998.  The project is running continuously since then with out any trouble.

CYCLONE REHABILITATION PROGRAM FOR SAFE DRINKING WATER IN ONGOLE AND NELLORE DISTRICTS OF A.P.

The scope of work includes, construction of infiltration well, laying of pumping main, construction of OHSR and connecting to distribution main.

The infiltration well being constructed in the sea and the cyclone flood water being diverted into deep seas.  The project was completed under agis of ISRO officials of Sriharikota Near Nellore in A.P.

The complicated work has been carried out with utmost care by employing best of the quality materials.

The total project cost was about Rs.60 million.

Presently, the scheme is under successful operation.

 
 

 


Send mail
 
dthrotarydrilling.com 
Home | About us | Subscribe | Advertise in Magazine | Board | Technical Papers | Interview | E-Paper | Editor's Desk | Media Kit | Directory | Contact Us | Site Map
Terms & Conditions - Disclaimer Copyright © 2009 dthrotarydrilling.com All rights reserved.